Project

At Siteworks, we specialise in smart, site-specific solutions that solve real problems. Whether it’s upgrading drainage, improving ground stability, or enhancing overall site performance, our team works closely with clients to deliver practical results that last.

Smart Solution for Marlborough School’s Flooding Problem

Marlborough School faced a recurring issue—its asphalt carpark would regularly flood during heavy rain, often causing water to enter nearby classrooms. Working closely with the project manager, we provided a long-term solution by replacing the existing surface with permeable concrete. This upgrade significantly reduced pressure on the existing stormwater system, allowing water to drain more effectively and preventing future flooding. The result is a safer, more resilient environment for staff and students.

Our Values

We Value Each Other

Each person brings their own strengths, and can be relied upon to support the team.

We Take Pride in our Work

From planning through to completion, we get stuck in every step of the way.

We Keep Communication Open

Through honesty and transparency, we can achieve successful, predictable project outcomes for our clients.

We Work Together for Safety

Every team member does their part to keep themselves and others safe on site.